RECENTLY COMPLETED PROJECTS:

OWNER: ÇALIK ENERJİ A.Ş.
PROJECT: BAZIAN I AIR HEADER FABRICATIONS (3″, 24 PCS)
YEAR: 2023
STATUS: COMPLETED
WORKS COMPLETED:
- ASME SEC VIII DIV-1 Design and Engineering (DP 11 barg)
- 316L Material supply (pipe, plate, nozzles)
- Fabrication works (cutting, beveling, threading, drilling, erection, welding, ndt)
- Hydrostatic testing (16.5 barg)
- Passivation
- International Packing

OWNER: ÇALIK ENERJİ A.Ş.
PROJECT: ROMPETROL COGEN POWER PLANT PROJECT
(70 MW) – CONDENSATE BUFFER TANK FABRICATION
YEAR: 2023
STATUS: COMPLETED
WORKS COMPLETED:
- EN 13445 Tank Design and Engineering
- Material supply (plates, profiles, nozzles, manholes, CO2 absorber, paintings
- Plate and Profile Fabrication works (cutting, beveling, bending, drilling)
- Fabrication Works (erection, welding, testing)
- Stairway and Handrail Fabrication
- CE Marking
- International Packing

OWNER: ÇALIK ENERJİ A.Ş.
PROJECT: ROMPETROL COGEN POWER PLANT PROJECT
(70 MW) – UNDERGROUND DOUBLE WALL CONDENSATE TANKS FABRICATION
1 m3 and 5m3
YEAR: 2023
STATUS: COMPLETED
WORKS COMPLETED:
- EN 12285-1 Tank Design and Engineering
- Material supply (plates, profiles, nozzles, manholes, leak detection PE wrapping)
- Plate and Profile Fabrication works (cutting, beveling, bending, drilling)
- Fabrication Works (erection, welding, testing)
- Valve box Fabrication
- PE wrapping application
- International Packing

OWNER: ÇALIK ENERJİ A.Ş.
PROJECT: BAZIAN II FIRE FIGHTING TANK
YEAR: 2022
STATUS: COMPLETED
WORKS COMPLETED:
- API 650 13th Edition Tank Design and Engineering
- Material supply (plates, profiles, nozzles, manholes, level indicator, paintings, insulation
- Plate and Profile Fabrication works (cutting, beveling, bending, drilling)
- Nozzle and Manhole Fabrication
- Stairway and Handrail Fabrication
- International Packing

OWNER: TAYRAŞ BAZ YAĞ RAFİNERİ A.Ş.
PROJECT: DEPOLAMA TANKLARI SAHASI BORULAMA PROJELENDİRME İŞLERİ
YEAR: 2020
STATUS: TAMAMLANDI
WORKS COMPLETED:
- Tank Field piping BOQ preparation
- Tank Field piping specification
- 3D tank modeling, nozzle orientation, basic design
- P&ID revisions
- Revision of pump inlet connections
- Addition of Utility lines materials to BOQ and specifications
- Basic design of piperack and pipe supports
- Vapor recovery line design above storage tanks