RECENTLY COMPLETED PROJECTS:

OWNER: ÇALIK ENERJİ A.Ş.

PROJECT: BAZIAN I AIR HEADER FABRICATIONS (3″, 24 PCS)

YEAR: 2023

STATUS: COMPLETED

WORKS COMPLETED:

  • ASME SEC VIII DIV-1 Design and Engineering (DP 11 barg)
  • 316L Material supply (pipe, plate, nozzles)
  • Fabrication works (cutting, beveling, threading, drilling, erection, welding, ndt)
  • Hydrostatic testing (16.5 barg)
  • Passivation
  • International Packing

OWNER: ÇALIK ENERJİ A.Ş.

PROJECT: ROMPETROL COGEN POWER PLANT PROJECT
(70 MW) – CONDENSATE BUFFER TANK FABRICATION

YEAR: 2023

STATUS: COMPLETED

WORKS COMPLETED:

  • EN 13445 Tank Design and Engineering
  • Material supply (plates, profiles, nozzles, manholes, CO2 absorber, paintings
  • Plate and Profile Fabrication works (cutting, beveling, bending, drilling)
  • Fabrication Works (erection, welding, testing)
  • Stairway and Handrail Fabrication
  • CE Marking
  • International Packing

OWNER: ÇALIK ENERJİ A.Ş.

PROJECT: ROMPETROL COGEN POWER PLANT PROJECT
(70 MW) – UNDERGROUND DOUBLE WALL CONDENSATE TANKS FABRICATION
1 m3 and 5m3

YEAR: 2023

STATUS: COMPLETED

WORKS COMPLETED:

  • EN 12285-1 Tank Design and Engineering
  • Material supply (plates, profiles, nozzles, manholes, leak detection PE wrapping)
  • Plate and Profile Fabrication works (cutting, beveling, bending, drilling)
  • Fabrication Works (erection, welding, testing)
  • Valve box Fabrication
  • PE wrapping application
  • International Packing

OWNER: ÇALIK ENERJİ A.Ş.

PROJECT: BAZIAN II FIRE FIGHTING TANK

YEAR: 2022

STATUS: COMPLETED

WORKS COMPLETED:

  • API 650 13th Edition Tank Design and Engineering
  • Material supply (plates, profiles, nozzles, manholes, level indicator, paintings, insulation
  • Plate and Profile Fabrication works (cutting, beveling, bending, drilling)
  • Nozzle and Manhole Fabrication
  • Stairway and Handrail Fabrication
  • International Packing

OWNER: TAYRAŞ BAZ YAĞ RAFİNERİ A.Ş.

PROJECT: DEPOLAMA TANKLARI SAHASI BORULAMA PROJELENDİRME İŞLERİ

YEAR: 2020

STATUS: TAMAMLANDI

WORKS COMPLETED:

  • Tank Field piping BOQ preparation
  • Tank Field piping specification
  • 3D tank modeling, nozzle orientation, basic design
  • P&ID revisions
  • Revision of pump inlet connections
  • Addition of Utility lines materials to BOQ and specifications
  • Basic design of piperack and pipe supports
  • Vapor recovery line design above storage tanks